Maiya Hermosa Los Corales (Bavaro, La Altagracia, DO - 23000) Under Construction

$145,000 USD
Pre-Construction Prices

TRUST REALTY

Andy Schlenker Andy Schlenker 1-800-717-0472 (Office) 1-809-399-3251 (Cell) 1-253-423-1008 (Fax) Request More Info

  • Maiya Hermosa | New Development | Los Corales Beach
  • Type: Condominium
  • Style: Apartment
  • Bedrooms: 1
  • Bathrooms: 1 "+ 1/2 bath"
  • Size: 74 sq. m. "794 sq.ft."
  • Development Level: Under Construction
  • Suite: Yes
  • Year Built: 2024

Description

Maiya Hermosa at Los Corales Beach is one of Bavaro's most elite projects, with high-quality finishes and modern design in every luxury condo. Choose from a selection of upscale 1 bedroom condos, extra large 2 bedroom condos with 2 1/2 bath, 2 story penthouses with 2 or 3 bedrooms & private roof terrace or VIP units with 2 covered parking spots,

Known for being steps to one of the best beaches in the world, Maiya Hermsosa property values benefit from proximity to the soft white sand and warm, crystalline blue Caribbean waters that entice vacationers from North America & Europe to venture and enjoy.

Being developed by a renowned developer, who has successfully completed 3 modern residential communities in Bavaro, this community has everything you've ever dreamed of.

Wide variety of different layouts available:

VIP Area (2 parking spaces per unit):
1 BR Condos, 1 1/2 BTH, Size 78 sq.m. (839 sq.ft.): $160,000
2 BR Condos, 2 1/2 BTH., Size 138 sq.m. (1,485 sq.ft.): $245,000
2 BR Penthouses, 2 1/2 BTH, Size 179 sq.m. (1,926 sq.ft.): $295,000
3 BR Penthouses, 3 1/2 BTH, Size 248 sq.m. (2,668 sq.ft.): 365,000

Main area (1 parking space per unit)
1 BR Condos, 1 1/2 BTH, Size 74 sq.m. (794 sq.ft.): $145,000
1 BR Condos, 1 1/2 BTH, Size 79 sq.m. (851 sq.ft.): $150,000
2 BR Penthouses, 2 1/2 BTH, Size 133 sq.m. (1,434 sq.ft.): $265,000
2 BR Penthouses, 2 1/2 BTH, Size 141 sq.m. (1,521 sq.ft.): $273,000

Start of construction: March. 2022, Delivery in 24 months.

$5000.00 reservation deposit.
20% in approximately 30 Days with the contract
50% during construction (monthly, bi monthly or quarterly payments) during 18 months
30% upon delivery of the unit with title

Attachments

P2#357861001
top
Information is deemed to be correct but not guaranteed.